You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jalan Petojo Sabangan XI Dinormalisasi

Channel Normalization on Jalan Petojo Sabangan XI Completed

The water channel normalization located at Jalan Petojo Sabangan XI, RT 12/04, Petojo Selatan Urban Village, Gambir, Central Jakarta, finally completed. It was started at the end of April 2024.

Hopefully, it can minimize flooding

Gambir Sub-district Water Resources (SDA) Executing Unit Head, M Imawan said the normalization was conducted to minimize flooding due to overflowing water in the channel.

"The condition of some channels in residential areas has been covered. Therefore, the staff has re-formed the routes," he expressed.

Channel on Jalan Angin Sejuk II Being Normalized

His party also installed U-Ditch concrete measuring 40x60 centimeters along with a cover plate 35 meters long, as well as five control tank points measuring 60x60 centimeters.

"This work involves 11 personnel every day. We'll finish it today," he explained.

The work received appreciation from one of the residents from RW 04 Petojo Selatan Urban Village, Adi (33). He hoped, his residential area could be free of flooding after it was done.

"Hopefully, it can minimize flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1366 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1030 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye958 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye769 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye733 personAldi Geri Lumban Tobing